Permanent international river basin organizations (IRBOs) come in many shapes and sizes, ranging from mainly facilitative in nature to those empowered to act on their own. Although differences in IRBO types may have important impacts on transboundary water resources management, systematic analysi...
Lautze, Jonathan
,
Wegerich, Kai
,
Kazbekov, Jusipbek S.
,
Yakubov, Murat
,
[International river basin organizations: variation, options and insights]
,
International river basin organizations: variation, options and insights
Abdullaev, Iskandar
,
Kazbekov, Jusipbek S.
,
David, S.
,
[Water conservation practices in the Syr Darya Basin of Central Asia: water productivity impacts and alternatives]
,
Water conservation practices in the Syr Darya Basin of Central Asia: water productivity impacts and alternatives
Irrigated agriculture in Central Asia can only be developed through increase of crop yields and reduction of water volumes applied per unit of agricultural production. Thus to improve agricultural production, proper agronomic measures and irrigation schedules have to be developed considering loca...
Jumaboev, Kahramon
,
Eshmuratov, Davron
,
Reddy, Junna Mohan
,
Anarbekov, Oyture
,
Kazbekov, Jusipbek S.
,
[Prediction of improved water productivity on-farm level in the selected cotton farms of Fergana and Andijan Provinces of Uzbekistan]
,
Prediction of improved water productivity on-farm level in the selected cotton farms of Fergana and Andijan Provinces of Uzbekistan
The management of water resources according to hydrological boundaries at different implementation levels (river basin, irrigation system, or water user association) is promoted internationally. This approach to water management, especially for the basin, is starting to be challenged from differe...
Wegerich, Kai
,
Kazbekov, Jusipbek S.
,
Mukhamedova, Nozilakhon
,
Musayev, Sardorbek
,
[Is it possible to shift to hydrological boundaries?: the Ferghana Valley meshed system]
,
Is it possible to shift to hydrological boundaries?: the Ferghana Valley meshed system
The river basin management approach in the Syr Darya basin fragmented after the disintegration of the Soviet Union. However, this approach had already created dependencies between riparian states such as transboundary water control infrastructure. At the national level, these states hardly cooper...
Wegerich, Kai
,
Kazbekov, Jusipbek S.
,
Kabilov, Firdavs
,
Mukhamedova, Nozilakhon
,
[Meso-level cooperation on transboundary tributaries and infrastructure in the Ferghana Valley]
,
Meso-level cooperation on transboundary tributaries and infrastructure in the Ferghana Valley
Mukhamedjanov, S.
,
Kazbekov, Jusipbek S.
,
Averina, L.
,
Ruziev, I.
,
Sagdullaev, R.
,
[Assessment of the results of water use and productivity in the pilot sites of the Water Productivity Improvement Project. In Russian]
,
Assessment of the results of water use and productivity in the pilot sites of the Water Productivity Improvement Project. In Russian
Bazarov, D. R.
,
Kazbekov, Jusipbek S.
,
Rakhmatullaev, S. A.
,
[History and present condition of urban water supply system of Tashkent City, Uzbekistan]
,
History and present condition of urban water supply system of Tashkent City, Uzbekistan
Abdullaev, Iskandar
,
Kazbekov, Jusipbek S.
,
Yakubov, Murat
,
Turral, Hugh
,
Manthrithilake, Herath
,
Jumaboev, Kahramon
,
[Institutional reforms at main canal level and their water allocation and yield impacts : A case from South Ferghana Canal, Uzbekistan]
,
Institutional reforms at main canal level and their water allocation and yield impacts : A case from South Ferghana Canal, Uzbekistan
Manthrithilake, Herath
,
Kazbekov, Jusipbek S.
,
Yakubov, Murat
,
[Final report of the Integrated Water Resources Management in Fergana Valley Project, phase 3, 1 May 2005 ? 31 April 2008]
,
Final report of the Integrated Water Resources Management in Fergana Valley Project, phase 3, 1 May 2005 ? 31 April 2008